ANNOUNCEMENT: UPDATE ON REPAIRS - We are temporarily closed for extensive repairs caused by a garbage truck hitting the building. We're still a few weeks from opening, but it's on the horizon. We hope to re-open near the end of March to the first of April 2023.
Currently, crews have framed, dug, & prepared the new footer. The interior wall has been reframed & plumbing has been installed. The new exterior wall will be erected as soon as the weather cooperates. Please understand that we have a lot to do once the wall is up. Electrical lines must be re-connected to the building & it will take GA Power 1-2 weeks to physically reconnect. The breaker box will need to be rewired & outlets/switches reconnected. We also have to reorganize everything & clean extensively. In some cases, it has be done professionally because it’s is out of certification. So, stay tuned.